Littleborough’s former AkzoNobel site shows how brownfield housing can include discounted ownership

Housing in Rochdale borough; illustrative archive photograph
Rochdale Daily; illustrative archive photograph

The former AkzoNobel site was announced as a 126-home development through Countryside Partnerships and Together Housing. Its original tenure package included 14 shared-ownership homes and five First Homes, with open-market housing sold under the Bovis brand.

The former AkzoNobel site was announced as a 126-home development through Countryside Partnerships and Together Housing. Its original tenure package included 14 shared-ownership homes and five First Homes, with open-market housing sold under the Bovis brand.

That package represents 19 affordable ownership homes, approximately 15.1% of the original total. It should not be described as 19 social-rented properties. Shared ownership also requires scrutiny of rent on the unowned share, service charges and the cost of purchasing additional shares.

The scheme occupies previously developed industrial land bought from Homes England. That distinguishes it from Bloor’s neighbouring farmland proposal. The two developments have separate totals and should be examined together for cumulative traffic, school and healthcare effects.

The announcement’s original delivery dates are now historical. A current assessment needs occupied homes, plots still to build and evidence that remediation conditions have been discharged. Prior industrial use justifies checking contamination evidence; it is not proof that completed homes are unsafe.

Vistry joined the CMA’s 2025 commitments settlement, closed without an infringement finding. This does not establish a breach at the local development.

Only remaining future completions belong in a forward housing forecast; houses already occupied cannot be added to the future pipeline again.

Location: Hollingworth Road, Littleborough; former AkzoNobel site

Planning stage: Permission announced in 2023; later material describes construction; remaining delivery requires update

Homes: 126 scheme homes

Let or for sale: 14 shared ownership and five First Homes; remaining homes announced for market sale

Land: Brownfield former industrial site

Final planning agreement: The executed Section 106 deed, complete schedules, payment triggers and later variations were not verified. This is an evidence gap, not a claim that no agreement exists.

Exact rents / prices: Market housing is sold as Bovis Hollin Bank, but a reproducible current primary-source exact plot quotation was not established in this review. Exact shared-ownership share prices, unowned-share rents, service charges and First Homes prices are not disclosed in the reviewed official/project records.

Affordable breakdown: Announced 126-home mix: 107 market sale, 14 shared ownership and five First Homes. No social-rent homes in that published breakdown. Current delivery and any varied legal schedule are not verified.

Funded school capacity: No site-specific funded school expansion verified. The historical Pennines forecast cannot prove available places for a particular family or cumulative future schemes.

Funded healthcare capacity: No site-specific funded NHS expansion, additional staffed appointment capacity or delivery date was established from the accessible council/government records reviewed. Proximity to a surgery is not a capacity assessment.

Funded transport capacity: Existing transport access does not establish the remediation/highway conditions have been discharged or that additional services are funded.

The outstanding details identified above are not yet available to Rochdale Daily. This article will be updated when the information becomes available.

Research checked 14 October 2026. Advertised prices are snapshots, not achieved sale prices.

Read the borough-wide housing investigation and the other developments: https://rochdaledaily.co.uk/articles/rochdale-housing-developments-affordability-schools-gp-transport

Evidence and sources:

Housing Forum: former AkzoNobel scheme and tenure, June 2023: https://housingforum.org.uk/countryside-and-together-housing-announce-126-home-scheme-in-rochdale/

Bloor: Hollingworth Road revised consultation scheme: https://bloorlittleborough.consultationonline.co.uk/

CMA housebuilder investigation: final commitments, October 2025: https://www.gov.uk/cma-cases/investigation-into-suspected-anti-competitive-conduct-by-housebuilders

Bovis: Hollin Bank sales and plot information: https://www.bovishomes.co.uk/developments/greater-manchester/hollin-bank-littleborough

Council school places forecast: appendix and Pennines assessment: https://rochdale.moderngov.co.uk/documents/s119525/Appendix%201%20-%20Need%20for%20Primary%20School%20Places%202026%20-%202029.pdf

For corrections or additional information, contact news@rochdaledaily.co.uk.

Sources